Advantage Product Enterprise

Wood Structural Installs

Scenario W1

A rigging point is required on a wood structural beam.
The beam is free of obstructions at the desired location.
Our RAT™ W1 will be used to provide a connection point for our G5 or G6 Gimbal.

Hardware required:

1 RAT™ W1 (Rigging Attachment Technique Wi) Refer to the RATs™ instruction manual for details.

1 set of Structural Screws such as GRK’s RSS™ series. Type, size, quantity and placement varies with application.

1 length of 3/4″ schedule 40 steel pipe, ASTM A53 Grade A or better, if using our G5 Drill Guide/Gimbal.

I APE Hanger™, U Tube™ or CHAIN Monkey™ speaker rigging system ordered with either the G5 or G6 Gimbal.

1 safety cable assembly. Hardware varies with application, see separate publication regarding safety cables.


ALWAYS OBSERVE WORK LOAD LIMITS

W1_diagram

Scenario W2

A rigging point is required on a wood structural beam.
The beam is free of obstructions at the desired location.
Our RAT™ W1 will be used to provide a connection point for our G5 or G6 Gimbal.

Hardware required:

1 RAT™ W1 (Rigging Attachment Technique Wi) Refer to the RATs™ instruction manual for details.

1 set of Structural Screws such as GRK’s RSS™ series. Type, size, quantity and placement varies with application.

1 length of 3/4″ schedule 40 steel pipe, ASTM A53 Grade A or better, if using our G5 Drill Guide/Gimbal.

I APE Hanger™, U Tube™ or CHAIN Monkey™ speaker rigging system ordered with either the G5 or G6 Gimbal.

1 safety cable assembly. Hardware varies with application, see separate publication regarding safety cables.


ALWAYS OBSERVE WORK LOAD LIMITS

W2-diagram

Scenario W3

A rigging point is required on a wood structural beam.
Obstructions exist at the desired location.
Our RAT™ W2 will be used to provide a connection point for our G5 or G6 Gimbal.

Hardware required:

1 RAT ™ W2 (Rigging Attachment Technique W2) Refer to the RATS™ instruction manual for details

1 set of Structural Screws such as GRK’s RSS™ series. Type, size, quantity and placement varies with application.

1 length of 3/4″ schedule 40 steel pipe, ASTM A53 Grade A or better, if using our G5 Drill Guide/Gimbal.

1 APE Hanger™, U Tube™ or CHAIN Monkey™ speaker rigging system ordered with either the G5 or G6 Gimbal.

1 safety cable assembly. Hardware varies with application, see separate publication regarding safety cables.


ALWAYS OBSERVE WORK LOAD LIMITS

W3-diagram